Exhaust Gas Waste Heat Recovery Boiler Unit for Industrial Steam Service
Packaged waste heat recovery boiler unit sourced from China for overseas industrial projects requiring steam and water heat recovery from generator or engine exhaust gas. This is equipment, not a CAS-numbered chemical product; RFQs should confirm engineering specifications, pressure rating, documentation package, export packing, installation support, and destination-country import requirements before purchase.
Quick buying facts
Identify the grade, package, and import market before comparing suppliers.
Use this page to check the product identity, common specification points, document scope, package notes, and destination-market questions before sending a China sourcing request.
CAS check: Not applicable; this is boiler equipment, not a chemical substance or mixtureIndustrial equipment - waste heat recovery boiler / steam boiler unitequipment-not-chemical-review-required
CAS check: Not applicable; this is boiler equipment, not a chemical substance or mixture
Function: Steam boiler / exhaust gas heat recovery boiler
Fuel / heat source: Waste heat from flue gas, suitable for HFO engine exhaust applications per source listing
Installation: Packaged boiler
Structure: Fire tube
Media: Steam and water
Water circulation: Natural circulation
Drum placement: Horizontal
Pressure category: Low pressure per listing
Operating pressure range stated: 0.5 MPa to 2.45 MPa
Reference operating pressure example: 1.0 MPa
Reference design pressure example: 1.1 MPa
Who uses this page
Target buyers
Industrial project procurement teams sourcing steam and heat recovery equipment
Power station and captive power plant buyers using oil or gas generator sets
Marine, industrial, and utility engineering contractors requiring packaged boiler units
Bangladesh, Cambodia, and South Asia importers of boiler and furnace equipment
EPC contractors handling waste heat recovery or energy-efficiency retrofit projects
Factories seeking customized low-pressure steam generation from exhaust gas waste heat
Before matching
Documents to check
CAS number, grade, assay, and impurity profile
SDS, COA, TDS, HS code, and transport classification
Destination-market import documents before supplier matching
Package and route
Packing notes
Transport package stated as standard export package; request detailed packing method, crate material, anti-corrosion protection, lifting marks, and seaworthy packing photos before shipment
Confirm whether export packing is suitable for sea freight to Bangladesh, Cambodia, or other destination ports
Ask for final packing list with equipment dimensions, gross/net weight, number of packages, and center-of-gravity or lifting instructions where applicable
For customized equipment, confirm whether auxiliary components, drawings, spare parts, valves, gauges, and documentation are packed separately and clearly marked
Request incoterm-specific quotation covering FOB, CFR, CIF, or DAP as needed
Applications and sourcing options
Check whether this product fits the buyer's actual application.
Clear application, grade, package, and document notes help separate real sourcing demand from a vague price check.
Use context
Common applications
Waste heat recovery from generator set exhaust gas
Industrial steam generation using flue gas heat recovery
Energy-efficiency retrofit for power generation facilities
Steam and hot water service in factories, utilities, or power station auxiliary systems
Customized boiler installation where drawings, foundation layout, and auxiliary equipment coordination are required
How we compare
Sourcing options
Factory-direct customized boiler unit from China
Packaged boiler configuration with export packing
RFQ based on operating pressure, steam capacity, exhaust gas flow, and site layout
Optional overseas service confirmation for installation guidance, debugging, training, repair, and maintenance
Third-party pre-shipment inspection and document review before export
Spare parts package quotation for overseas maintenance planning
Human review
Compliance notes
This listing is for industrial equipment and does not require CAS, assay, impurity, COA, or SDS checks normally used for chemical sourcing
Confirm destination-country boiler import requirements, pressure vessel registration, inspection certificates, and local installation approvals before ordering
Request manufacturing license, pressure test report, material certificates, welding inspection records, factory acceptance test report, and conformity documents relevant to the buyer's jurisdiction
Confirm whether the unit falls under pressure equipment, boiler safety, energy-efficiency, or industrial plant permitting rules in the destination country
DG awareness: Boiler equipment itself is generally not a dangerous good, but any included chemicals, batteries, oils, coatings, or pressurized accessories should be declared separately if present
Export awareness: Verify HS code 84021200, export documents, country-of-origin certificate, commercial invoice, packing list, and any inspection documents required by destination customs
Do not rely on marketplace labels alone; request supplier-issued documents and third-party inspection options if the project requires audited compliance
Confirm whether on-site installation, commissioning, and training are available in the destination country and whether visas, local safety permits, and site access are buyer responsibilities
Buyer search paths
Related sourcing terms
These terms support long-tail discovery while keeping the page focused on useful product and China export buying context.
Share target market, quantity, packaging scope, artwork status, delivery destination, and required documents so CHN Chemicals can prepare a cleaner supplier comparison.
Questions to confirm
Is this quotation for a complete exhaust gas boiler system or only the boiler body? Please list included auxiliaries and excluded items.
What operating pressure, steam output, exhaust gas flow, inlet temperature, outlet temperature, and allowable back pressure are used for the design?
Which boiler code, pressure vessel standard, welding standard, and inspection standard will be applied?
Can you provide material certificates, welding inspection reports, hydraulic pressure test report, factory acceptance test report, and final drawings before shipment?
Is the stated HS code 84021200 applicable to the final customized configuration and destination country?
What is the recommended model for HFO engine exhaust service, and what engine brand/model data do you need from the buyer?
What are the impurity or fouling considerations for exhaust gas service, such as dust, sulfur compounds, ash, or corrosive condensate, and how are they addressed in design documentation?
What export packing method will be used, and can you provide packing photos before shipment?
Checks before quote
This listing is for industrial equipment and does not require CAS, assay, impurity, COA, or SDS checks normally used for chemical sourcing
Confirm destination-country boiler import requirements, pressure vessel registration, inspection certificates, and local installation approvals before ordering
Request manufacturing license, pressure test report, material certificates, welding inspection records, factory acceptance test report, and conformity documents relevant to the buyer's jurisdiction
Confirm whether the unit falls under pressure equipment, boiler safety, energy-efficiency, or industrial plant permitting rules in the destination country
DG awareness: Boiler equipment itself is generally not a dangerous good, but any included chemicals, batteries, oils, coatings, or pressurized accessories should be declared separately if present
Export awareness: Verify HS code 84021200, export documents, country-of-origin certificate, commercial invoice, packing list, and any inspection documents required by destination customs
Do not rely on marketplace labels alone; request supplier-issued documents and third-party inspection options if the project requires audited compliance
Confirm whether on-site installation, commissioning, and training are available in the destination country and whether visas, local safety permits, and site access are buyer responsibilities
Next step
Send the product page with your target quantity and market. A sourcing manager can then confirm sample options, supplier fit, packaging details, and open document gaps.